We have an independent QC department.

A.Each houses will be inspected at least 5 times before container loading.

B.Pre-production confirmation: After you confirm the order, our production department will do double confirmation for the details of the house and make production drawings and material list

C.Frame inspection: inspecting the thickness, width, height, customized parts and quality of the whole frame .

D.Inspection of the overall housing assembly process.

  • Windows inspection
  • Interior wall and exterior wall panel inspection
  • Floor inspection
  • Entrance doors and bedroom doors inspection
  • Ceiling inspection;
  • Plumbing system inspection
  • Electrical system inspection
  • Accessories inspection

E.Final inspection before shipping

  • waterproof test
  • The overall house inspection after unfolded;
  • Folding state inspection;
  • Packing state inspection

F.Production supervision and follow-up: During production, QC department will supervise and follow up the details of the production from raw material preparation to production completion;