We have an independent QC department.
A.Each houses will be inspected at least 5 times before container loading.
B.Pre-production confirmation: After you confirm the order, our production department will do double confirmation for the details of the house and make production drawings and material list
C.Frame inspection: inspecting the thickness, width, height, customized parts and quality of the whole frame .
D.Inspection of the overall housing assembly process.
- Windows inspection
- Interior wall and exterior wall panel inspection
- Floor inspection
- Entrance doors and bedroom doors inspection
- Ceiling inspection;
- Plumbing system inspection
- Electrical system inspection
- Accessories inspection
E.Final inspection before shipping
- waterproof test
- The overall house inspection after unfolded;
- Folding state inspection;
- Packing state inspection
F.Production supervision and follow-up: During production, QC department will supervise and follow up the details of the production from raw material preparation to production completion;